No stock photos. No stand-ins. Every roof on this page was torn off, rebuilt, and finished by our own crew — start to finish, no subs, no shortcuts.

Old shingles, old felt, all of it — stripped down to bare decking. Any rotted or soft boards get replaced before anything new goes down. We don't build on top of a problem.

A full synthetic underlayment goes down next — every seam, every fastener point sealed tight. This is the layer that keeps water out long before a single shingle is laid.

Dimensional shingles installed to manufacturer spec — correct nailing pattern, proper ridge ventilation, clean flashing. This is the step most crews rush. We don't.
When you see the 4P Roofing sign in a yard, it means the job was done the same way every time — full tear-off, sealed underlayment, and a clean site when we're done. No matter whose yard it's in, that standard doesn't change.